roadmap-scopecraft
by auge2u
SKILL.md
name: roadmap-scopecraft description: Builds a full-scope product roadmap for an existing project by scanning PRDs in /docs, extracting legacy tasks, and creating a comprehensive plan to move from MVP/early release to the next major stage.
You are acting as a product owner partnering with senior engineers and a PMF-focused team.
When to use
Use this skill when the user asks for:
- roadmap planning from an existing repo
- converting legacy scope or pending tasks into a clean backlog
- PRD review / reconciliation across multiple documents
- maturity planning (MVP → next major stage)
Ground rules
- Prefer evidence from the repo:
/docs,README, ADRs, architecture docs, backlog/task files. - If PRDs conflict, reconcile by:
- newest decision wins (when clearly dated/versioned),
- note divergence explicitly,
- propose a decision and list stakeholders needed.
- Produce outputs as files under
./scopecraft/for easy sharing.
Scratchpad protocol (for orchestrated mode)
When running in orchestrated/loop mode:
- Read first: Check
.agent/scratchpad.mdfor prior context - Track progress: Note what's done, what's remaining, blockers
- Update after: Write progress to scratchpad before completing iteration
Scratchpad format:
# Scratchpad — ralph-it-up-roadmap
## Last Updated
[timestamp]
## Progress
- [x] Completed item
- [ ] Remaining item
## Quality Gate Status
[Updated by validation - see below]
## Decisions Made
- [Decision and rationale]
## Blockers
- [Current blockers]
## Next Steps
- [What to do next iteration]
Quality gates (MUST pass before LOOP_COMPLETE)
Before declaring completion, ALL blocker-level quality gates must pass:
Output Completeness
- all_outputs_exist: All 6 scopecraft files created
- vision_not_empty: VISION_AND_STAGE_DEFINITION.md has 20+ lines
- roadmap_not_empty: ROADMAP.md has 50+ lines
Content Quality
- phases_in_range: ROADMAP.md has 3-5 phases (matches
^## Phase \d) - epics_have_stories: EPICS_AND_STORIES.md has 5+ stories (matches
^#### Story) - stories_have_acceptance_criteria: 5+ "Acceptance Criteria" sections
- risks_documented: 3+ risk entries in table format
- metrics_defined: "North Star Metric" section exists
No Placeholders
- no_todo_placeholders: Zero
[TODO],[TBD],[PLACEHOLDER]markers - no_empty_brackets: Zero empty
[ ]template brackets (warning)
Self-Validation Process
Before each iteration ends, mentally run through these checks:
1. Count files in scopecraft/ - must be 6
2. Count "## Phase" headers in ROADMAP.md - must be 3-5
3. Count "#### Story" headers in EPICS_AND_STORIES.md - must be 5+
4. Search for [TODO], [TBD], [PLACEHOLDER] - must be 0
5. Verify "North Star Metric" exists in METRICS_AND_PMF.md
6. Verify risk table has 3+ rows with Technical/Product/GTM
If ANY blocker fails, continue iterating. Update scratchpad with:
- Which gates failed
- What needs to be fixed
- Plan for next iteration
Discovery procedure (do this first)
- Inventory documents:
- list PRDs and PRD-like docs in
/docs(initial + historical) - identify architecture decisions (ADRs), constraints, and non-goals
- list PRDs and PRD-like docs in
- Inventory scope sources:
- open issues / TODOs / backlog lists / "legacy scope" notes
- Infer current stage:
- MVP/alpha/beta/early release signals (missing monitoring, limited permissions, minimal onboarding, weak reliability, etc.)
Convert legacy scope into a backlog model
Normalize every task into:
- Epic
- User story (who/what/why)
- Acceptance criteria (observable, testable)
- Dependencies (tech + org)
- Risk level
- Complexity bucket (S/M/L/XL)
Build the maturity roadmap (required structure)
Use the templates in templates/ and produce:
1) VISION_AND_STAGE_DEFINITION.md
- Product vision summary (customer + problem + value)
- "Next major stage" definition with completion criteria
- Assumptions + constraints
2) ROADMAP.md
- 3–5 phases max
- For each phase:
- objective (outcome)
- key deliverables
- definition of done
- metrics / KPIs
- major risks
3) EPICS_AND_STORIES.md
Group epics by themes:
- Core value delivery
- Adoption/onboarding
- Reliability/performance
- Security/compliance
- Developer experience / platform maturity
- Monetization/packaging (if applicable)
Each epic must include:
- user-facing intent
- stories with acceptance criteria
- dependencies and sequencing notes
4) RISKS_AND_DEPENDENCIES.md
- Technical risks, product risks, GTM risks
- Mitigations and contingency paths
- Dependency map (internal + external)
5) METRICS_AND_PMF.md
- North Star metric + supporting metrics
- PMF signals: activation funnel, retention, usage depth
- Instrumentation plan (what must be tracked to call the stage "done")
6) OPEN_QUESTIONS.md
- Questions blocking prioritization or delivery
- Proposed experiments or stakeholder asks to resolve them
Completion promise
When running in orchestrated mode (ralph-orchestrator compatible):
- Iterate until outputs are complete and consistent
- ALL blocker quality gates must pass
- Use the completion promise exactly:
LOOP_COMPLETE - Improve gaps rather than rewriting everything each cycle
DO NOT issue LOOP_COMPLETE if any blocker gate fails.
Score
Total Score
Based on repository quality metrics
SKILL.mdファイルが含まれている
ライセンスが設定されている
100文字以上の説明がある
GitHub Stars 100以上
3ヶ月以内に更新がある
10回以上フォークされている
オープンIssueが50未満
プログラミング言語が設定されている
1つ以上のタグが設定されている
Reviews
Reviews coming soon