product-qa
by kurko
An OS for agents running a company
SKILL.md
name: "Product QA" description: "Quality assurance for product delivery. Use when verifying features, creating test plans, or assessing release readiness."
Product QA
Quality assurance methodology for ensuring products meet requirements before release.
When to Use
- When a feature is approaching completion and needs QA verification
- When creating test plans for upcoming features
- When assessing if a release is ready to ship
- When defining acceptance criteria validation approaches
- When conducting regression testing after changes
Dependencies
- user-stories.md - Acceptance criteria are the source of truth for verification
- prd.md - PRD defines the requirements being validated
Book Triggers
Reference: [[books/software-craft.md]]
- Apply "Growing Object-Oriented Software" for test-first thinking at product level
- Apply testing pyramid concepts: fast unit tests, integration tests, slower E2E tests
Reference: [[books/product-innovation.md]]
- Apply "Escaping the Build Trap" - validate outcomes, not just outputs
- Apply "Inspired" for product discovery and validation methods
QA Philosophy
1. Verification vs Validation
| Type | Question | Focus |
|---|---|---|
| Verification | Did we build it right? | Does implementation match spec |
| Validation | Did we build the right thing? | Does it solve the user problem |
QA covers both. Don't ship something that "works" but doesn't solve the problem.
2. Quality Gates Not Quality Control
Quality should be built in, not inspected in. QA is a gate that confirms quality exists, not a department that creates it.
- Developers own unit and integration tests
- QA owns acceptance and regression testing
- Product owns validation that it solves the problem
3. Risk-Based Testing
Not all features need the same testing depth. Allocate effort based on:
| Risk Factor | Higher Testing | Lower Testing |
|---|---|---|
| User impact | Many users affected | Few users |
| Data integrity | Writes/deletes data | Read-only |
| Complexity | Many edge cases | Simple logic |
| Reversibility | Hard to undo | Easy rollback |
| Dependencies | Many integrations | Isolated feature |
Test Planning
Test Plan Template
## Test Plan: [Feature Name]
### Overview
- **PRD Reference**: [Link to PRD]
- **User Stories**: [List story IDs]
- **Risk Level**: Low / Medium / High
- **Testing Approach**: [Summary]
### Scope
**In Scope:**
- [Functionality to test]
- [Edge cases to cover]
**Out of Scope:**
- [What won't be tested and why]
### Test Cases
#### Happy Path
| ID | Scenario | Steps | Expected Result | Status |
|----|----------|-------|-----------------|--------|
| TC-01 | [Basic flow] | [Steps] | [Result] | |
| TC-02 | [Variant] | [Steps] | [Result] | |
#### Edge Cases
| ID | Scenario | Steps | Expected Result | Status |
|----|----------|-------|-----------------|--------|
| TC-10 | [Edge case] | [Steps] | [Result] | |
#### Error Handling
| ID | Scenario | Steps | Expected Result | Status |
|----|----------|-------|-----------------|--------|
| TC-20 | [Error condition] | [Steps] | [Result] | |
### Acceptance Criteria Mapping
| AC ID | Acceptance Criteria | Test Cases | Status |
|-------|--------------------|-----------:|--------|
| AC-1 | [From user story] | TC-01, TC-02 | |
| AC-2 | [From user story] | TC-10 | |
### Environment Requirements
- [Specific environment needs]
- [Test data requirements]
- [Integration dependencies]
### Risks and Mitigations
- [Testing risk]: [Mitigation]
Acceptance Criteria Testing
What Makes Good Acceptance Criteria Testable
From the user-stories skill, acceptance criteria must be:
- Specific: One behavior per criterion
- Measurable: Can objectively pass/fail
- Independent: Can test without other criteria
Testing Approach per AC Type
| AC Pattern | Testing Approach |
|---|---|
| "Given/When/Then" | Map directly to test case |
| "User can..." | Verify user journey end-to-end |
| "System must..." | Verify system behavior |
| "Performance: X in Y time" | Load test with measurement |
Traceability
Every acceptance criterion must have at least one test case. Track coverage:
## Acceptance Criteria Coverage
| Story | Total AC | Tested | Coverage |
|-------|----------|--------|----------|
| US-01 | 5 | 5 | 100% |
| US-02 | 3 | 3 | 100% |
| US-03 | 4 | 3 | 75% ⚠️ |
Regression Testing
When to Run Regression
- After any bug fix (verify fix doesn't break other things)
- Before major releases
- After infrastructure changes
- After dependency updates
Regression Suite Management
Maintain a core regression suite covering:
- Critical paths: User journeys that must never break
- Past bugs: Test for every bug fixed (prevent regression)
- Integration points: Where systems connect
Regression Prioritization
Not everything can be tested every time. Prioritize:
| Priority | Include When |
|---|---|
| P1 (Always) | Every release, critical paths |
| P2 (Major releases) | Monthly releases, broader coverage |
| P3 (Quarterly) | Full regression, edge cases |
Release Readiness Assessment
Release Checklist
## Release Readiness: [Version/Feature]
### Quality Gates
- [ ] All acceptance criteria have passing tests
- [ ] No P1 (critical) bugs open
- [ ] No P2 (major) bugs open OR explicitly accepted by Product
- [ ] Regression suite passes
- [ ] Performance meets requirements
- [ ] Security review completed (if applicable)
### Test Summary
| Category | Total | Passed | Failed | Blocked |
|----------|-------|--------|--------|---------|
| Functional | | | | |
| Edge cases | | | | |
| Error handling | | | | |
| Regression | | | | |
### Known Issues
| ID | Severity | Description | Decision |
|----|----------|-------------|----------|
| | P3 | [Minor issue] | Ship with known issue |
### Sign-Off
- [ ] QA Lead: [Name] - Date:
- [ ] Product Manager: [Name] - Date:
- [ ] Engineering Lead: [Name] - Date:
Go/No-Go Decision Framework
| Condition | Decision |
|---|---|
| All P1/P2 bugs resolved, all AC tested | GO |
| P2 bugs exist, Product accepts risk | GO with documented exceptions |
| P1 bugs exist | NO-GO until resolved |
| AC not fully tested | NO-GO until coverage complete |
Bug Reporting
Bug Report Template
## Bug: [Brief Description]
**Severity**: P1 (Critical) / P2 (Major) / P3 (Minor) / P4 (Trivial)
**Found in**: [Version/Environment]
**Related to**: [Story/Feature]
### Summary
[One sentence description]
### Steps to Reproduce
1. [Step 1]
2. [Step 2]
3. [Step 3]
### Expected Result
[What should happen]
### Actual Result
[What actually happens]
### Evidence
[Screenshots, logs, error messages]
### Environment
- Browser/Device:
- OS:
- User role:
- Test data:
Severity Definitions
| Severity | Definition | Response |
|---|---|---|
| P1 (Critical) | System unusable, data loss, security breach | Fix immediately, block release |
| P2 (Major) | Major feature broken, no workaround | Fix before release |
| P3 (Minor) | Feature partially broken, workaround exists | Fix if time permits |
| P4 (Trivial) | Cosmetic, minor inconvenience | Backlog for future |
Exploratory Testing
Beyond scripted tests, exploratory testing finds unexpected issues.
Session-Based Approach
## Exploratory Session
**Charter**: [What area to explore, what to look for]
**Time box**: [Duration, typically 30-60 min]
**Tester**: [Name]
### Notes
[Stream of consciousness notes during testing]
### Bugs Found
- [Bug 1]
- [Bug 2]
### Observations
[Things that aren't bugs but worth noting]
### Areas to Investigate Further
[Topics that need more testing]
Exploratory Techniques
- Boundary testing: Test at limits (0, 1, max, max+1)
- Negative testing: Try to break it (invalid inputs, rapid clicks)
- Persona-based: Test as different user types
- Scenario-based: Test realistic user journeys, not just features
Integration with Engineering
QA in Development Flow
Story Ready -> Development -> Code Review -> QA Testing -> Done
| |
+--- Unit/Integration Tests ---+
(Engineering)
Shift-Left Testing
Involve QA early to:
- Review acceptance criteria before development
- Identify testability issues early
- Create test cases in parallel with development
Test Automation Ownership
| Test Type | Owner | Tools |
|---|---|---|
| Unit tests | Developer | Jest, RSpec, etc. |
| Integration tests | Developer | Testing library |
| E2E / Acceptance | QA + Developer | Cypress, Playwright |
| Performance | QA / DevOps | k6, Locust |
Anti-Patterns
- Testing in silos - QA should be integrated, not a separate phase at the end
- Only happy path - Edge cases and error handling need tests too
- No traceability - Every test should map to a requirement
- Testing everything equally - Risk-based prioritization is essential
- Manual-only testing - Automate what's repeatable
- Treating QA as gatekeepers - Quality is everyone's responsibility
- Shipping with P1 bugs - Never accept critical issues
Output Format
When completing QA activities, produce:
For Test Planning
- Test plan document following template
- Acceptance criteria coverage matrix
For Test Execution
- Test execution results with pass/fail status
- Bug reports for any failures
- Regression results summary
For Release Assessment
- Release readiness checklist
- Known issues list with decisions
- Sign-off documentation
Checklist: Before Release
- All acceptance criteria mapped to test cases
- All test cases executed
- No P1 bugs open
- P2 bugs resolved or explicitly accepted
- Regression suite passes
- Exploratory testing completed
- Release readiness assessment documented
- Sign-offs obtained
スコア
総合スコア
リポジトリの品質指標に基づく評価
SKILL.mdファイルが含まれている
ライセンスが設定されている
100文字以上の説明がある
GitHub Stars 100以上
3ヶ月以内に更新がある
10回以上フォークされている
オープンIssueが50未満
プログラミング言語が設定されている
1つ以上のタグが設定されている
レビュー
レビュー機能は近日公開予定です