スキル一覧に戻る
aiskillstore

devflow

by aiskillstore

devflowは、other分野における実用的なスキルです。複雑な課題への対応力を強化し、業務効率と成果の質を改善します。

102🍴 3📅 2026年1月23日
GitHubで見るManusで実行

SKILL.md


name: devflow description: End-to-end agent development process. Use when coordinating work, dispatching agents, or reviewing PRs.

DEVFLOW: Agent Development

5-phase workflow for coordinated multi-agent development.

⚠️ MANDATORY: 100% Issue/Task Coverage

Every phase must verify that 100% of original issue/task requirements are being addressed.

  • Phase 1: Extract ALL requirements from original issue
  • Phase 2: Dispatch agents with complete requirement lists
  • Phase 3: Review must verify 100% coverage before quality check
  • Phase 5: Cannot merge until 100% of original requirements implemented

Incomplete implementations = SEND BACK, do not proceed.

Phase 1: Oracle Assessment

  • Assess codebase state with Oracle
  • Identify completed work, remaining work, dependencies
  • Extract ALL requirements from original issue/task (gh issue view <number>)
  • Break down into parallelizable tasks ensuring ALL requirements are covered

Phase 2: Parallel Implementation

Dispatch Docker agents:

  • Clone repo, format locally (cargo +nightly fmt)
  • Branch as feat/name or fix/name
  • Open PR to correct base branch with Closes #X in body
  • Never push to existing branches

PR MUST include issue links:

  • Closes #X or Fixes #X for issues being addressed
  • "Related Issues" section in PR body
  • Verify: gh pr view --json closingIssuesReferences

Phase 3: Ultra-Critical Review

After CI passes, run 6-pass review:

PassFocus
0.5100% issue/task coverage verification (MANDATORY FIRST)
1Runtime/compile failures
2Patterns, imports, dead code
3Abstractions, hard-coded values
4Environment compatibility
5Verification commands
6Context synthesis

CRITICAL: Pass 0.5 (issue coverage) MUST pass before proceeding. If coverage < 100%, send agent back immediately.

Review Escalation

  1. Escalate to coordinator first — Architecture/tradeoff questions
  2. Coordinator applies good judgment — Based on codebase patterns
  3. Escalate to human when needed — Significant risk or uncertainty

Review Timing

  • Pre-PR review: After agent work, before PR creation
  • Post-PR review: After PR creation, before merge

Phase 4: Human Approval

Pause for: PR approval, complex decisions requiring human judgment.

Continue through: workstream setup, agent dispatch, CI fixes, review feedback.

Phase 4.5: FINAL COVERAGE GATE

MANDATORY: Before any merge, perform LINE-BY-LINE requirement verification.

# Extract ALL requirements from issue
gh issue view <number> --json body --jq '.body' | grep -E "^\- \["
gh issue view <number>

Create verification table:

| Requirement | Status | Evidence |
|-------------|--------|----------|
| [from issue] | ✅ | `file:line` |
| [from issue] | ❌ MISSING | Not in PR |
| [from issue] | ⚠️ PARTIAL | [what's missing] |

**Honest Assessment**: X% (Y of Z requirements)
CoverageAction
100%✅ Proceed to merge
< 100%❌ Return to Phase 2 with line-by-line gap list

Phase 5: Merge & Continue

Before merge, verify issue linking:

gh pr view <NUMBER> --json closingIssuesReferences
# Must show linked issues - if empty, send back to fix

Merge PRs in dependency order. Only after Final Coverage Gate passes AND issues are linked. Issues auto-close on merge.


Mermaid Diagrams in Reviews and PRs

Reviews and PRs SHOULD include Mermaid diagrams when changes involve flows, states, or architecture.

Change TypeDiagram
Flow changeflowchart before/after
API modificationsequenceDiagram
State handlingstateDiagram-v2
Architecture changeflowchart with subgraphs

Example in review:

### New Token Flow
```mermaid
sequenceDiagram
    Client->>Server: Request (expired token)
    Server-->>Client: 401 + refresh
    Client->>Server: New request
```

Anti-Patterns

WrongRight
Merge with incomplete coverage100% of issue requirements implemented first
PR without issue linksEvery PR has Closes #X for related issues
Push to branchFeature branch + PR
Checkbox review6-pass analysis (starting with coverage check)
Coordinator implementsDispatch agents
Pause every stepPause for PR decisions
Skip CIWait for CI
"Core requirements done"ALL requirements done, no exceptions
Merge then close issue manuallyUse Closes #X for auto-close on merge
Text-only complex changesMermaid diagrams for flows/states

スコア

総合スコア

60/100

リポジトリの品質指標に基づく評価

SKILL.md

SKILL.mdファイルが含まれている

+20
LICENSE

ライセンスが設定されている

0/10
説明文

100文字以上の説明がある

0/10
人気

GitHub Stars 100以上

+5
最近の活動

3ヶ月以内に更新

+5
フォーク

10回以上フォークされている

0/5
Issue管理

オープンIssueが50未満

+5
言語

プログラミング言語が設定されている

+5
タグ

1つ以上のタグが設定されている

+5

レビュー

💬

レビュー機能は近日公開予定です