← スキル一覧に戻る

auto-tdd-executor
by Henry229
⭐ 0🍴 0📅 2026年1月11日
SKILL.md
name: auto-tdd-executor description: Combines Ralph Wiggum loops with structured feature plans for automated TDD-driven development. Creates phase-based plans with quality gates, then executes each phase using Ralph loops with Beads for persistent state tracking. Includes E2E testing with Playwright agents. Use for automated overnight development, complex feature implementation, or when you want AI to iterate until tests pass.
Auto TDD Executor
Automated TDD development with Ralph Wiggum loops, Beads persistence, and Playwright E2E testing.
Core Architecture
┌──────────────────────────────────────────────────────────────────────┐
│ Auto TDD Executor │
├──────────────────────────────────────────────────────────────────────┤
│ │
│ ┌─────────────┐ ┌─────────────┐ ┌─────────────────────────┐ │
│ │ Feature │───▶│ Ralph │───▶│ Beads │ │
│ │ Planner │ │ Wiggum │ │ (Persistence) │ │
│ └─────────────┘ └─────────────┘ └─────────────────────────┘ │
│ │ │ │ │
│ ▼ ▼ ▼ │
│ Phase-based TDD Loop Survives context │
│ Quality Gates Red-Green-Refactor compaction │
│ │
│ ┌────────────────────────────────────────────────────────────────┐ │
│ │ E2E Test Phase │ │
│ │ ┌─────────────┐ ┌─────────────┐ ┌─────────────┐ │ │
│ │ │ Playwright │ │ Playwright │ │ Playwright │ │ │
│ │ │ Planner │ │ Generator │ │ Healer │ │ │
│ │ └─────────────┘ └─────────────┘ └─────────────┘ │ │
│ └────────────────────────────────────────────────────────────────┘ │
│ │
└──────────────────────────────────────────────────────────────────────┘
Complete Workflow
┌─────────────────────────────────────────────────────────────────────┐
│ Full Development Loop │
├─────────────────────────────────────────────────────────────────────┤
│ │
│ 1. PLAN │
│ └─▶ /auto-tdd-start │
│ └─▶ Create Beads issues from plan │
│ │
│ 2. IMPLEMENT (TDD) ┌───────────────┐ │
│ └─▶ /auto-tdd-run │ │ │
│ ├─▶ 🔴 RED: Write failing tests ────────┤ Ralph │ │
│ ├─▶ 🟢 GREEN: Implement minimal code ───┤ Wiggum │ │
│ ├─▶ 🔵 REFACTOR: Improve quality ───────┤ Loop │ │
│ └─▶ ✅ Unit Tests Pass ─────────────────┘ │ │
│ │ │
│ 3. E2E TEST ▼ │
│ └─▶ /auto-tdd-e2e ┌───────────────┐ │
│ ├─▶ playwright-test-planner ────────────┤ Parallel │ │
│ ├─▶ playwright-test-generator ──────────┤ Agents │ │
│ └─▶ If fail: playwright-test-healer ────┘ │ │
│ │ │
│ ├─── FAIL ──▶ Back to Step 2 (fix bugs) │
│ │ │
│ ▼ │
│ 4. QUALITY GATE │
│ └─▶ scripts/quality-gate.sh │
│ ├─▶ Unit Tests │
│ ├─▶ Lint │
│ ├─▶ Type Check │
│ ├─▶ Build │
│ └─▶ E2E Tests │
│ │ │
│ ├─── FAIL ──▶ Back to Step 2 │
│ │ │
│ ▼ │
│ 5. COMMIT │
│ └─▶ git add . && git commit -m "Phase complete" │
│ └─▶ git push │
│ └─▶ bd close $ISSUE_ID │
│ │ │
│ ▼ │
│ 6. NEXT PHASE ──────┴──▶ Repeat from Step 2 │
│ │
└─────────────────────────────────────────────────────────────────────┘
Commands
| Command | Description |
|---|---|
/auto-tdd-start | Initialize project with Beads issues from plan |
/auto-tdd-run | Execute current phase with TDD + E2E |
/auto-tdd-e2e | Run E2E tests with Playwright agents |
/auto-tdd-status | Show progress and remaining phases |
Prerequisites
# 1. Ralph Wiggum plugin
/plugin install ralph-wiggum@anthropics
# 2. Beads CLI
npm install -g @beads/bd
bd init
# 3. Playwright (for E2E)
npm install -D @playwright/test
npx playwright install
Quick Start
# 1. Create plan document
# Use feature-planner skill or create .doc/plans/PLAN_<feature>.md
# 2. Initialize beads issues
/auto-tdd-start
# 3. Execute phases (repeat until done)
/auto-tdd-run
# 4. Check status
/auto-tdd-status
Playwright Agent Integration
playwright-test-planner
- Explores the application UI
- Creates test scenarios for user flows
- Outputs:
specs/test.plan.md
playwright-test-generator
- Reads test plan
- Generates Playwright test files
- Outputs:
tests/<suite>/<test>.spec.ts
playwright-test-healer
- Debugs failing tests
- Updates selectors and assertions
- Fixes flaky tests
Parallel Execution
Launch 3 Task tools in parallel:
1. subagent_type="playwright-test-generator" (Auth tests)
2. subagent_type="playwright-test-generator" (User tests)
3. subagent_type="playwright-test-generator" (API tests)
Quality Gate Script
# Run all checks
./scripts/quality-gate.sh
# With options
./scripts/quality-gate.sh --verbose --skip-e2e
Returns:
- Exit 0 + "QUALITY_GATE_PASSED" if all pass
- Exit 1 + "QUALITY_GATE_FAILED" if any fail
TDD Prompt Template (Simplified)
/ralph-loop "
═══ PHASE: [Title] ═══
Issue: [ISSUE_ID]
CONTEXT: bd show [ISSUE_ID]
TDD:
🔴 RED: Write tests → npm test → Expect FAIL
🟢 GREEN: Implement → npm test → Expect PASS
🔵 REFACTOR: Clean → npm test → Confirm PASS
QUALITY GATE:
npm test && npm run lint && npm run type-check && npm run build
ON PASS:
git add . && git commit -m 'Complete: [Title]'
bd close [ISSUE_ID]
<promise>PHASE_COMPLETE</promise>
" --max-iterations 50 --completion-promise "PHASE_COMPLETE"
Beads Integration
# Create phase issue
bd create "Phase 1: Core Models" -t task -p 1
# Set dependencies
bd dep add <phase2> <phase1> --type blocks
# Update progress
bd update <id> --notes "Progress: 50%"
# Close on completion
bd close <id> --reason "Quality gate passed"
# Check what's ready
bd ready
Directory Structure
project/
├── .beads/ # Beads database
├── docs/plans/ # Plan documents
│ └── PLAN_<feature>.md
├── specs/ # E2E test plans
│ └── test.plan.md
├── tests/ # E2E test files
│ ├── seed.spec.ts
│ └── <suite>/
│ └── <test>.spec.ts
├── src/ # Implementation
└── scripts/
└── quality-gate.sh # Quality gate automation
Troubleshooting
Ralph loop never completes
- Check
--completion-promisematches exactly - Verify quality gate commands are correct
- Increase
--max-iterations
E2E tests keep failing
- Run
playwright-test-healeragent - Check if app is running (
npm run dev) - Verify selectors haven't changed
Context loss mid-phase
- Beads preserves state:
bd show <id> - Git commits preserve code
- Restart Ralph with same prompt
Quality gate fails
- Run
./scripts/quality-gate.sh --verbose - Fix one issue at a time
- Rerun until all pass
Best Practices
- Phase Sizing: 1-4 hours max per phase
- Test First: Always write tests before code
- Small Commits: Commit after each TDD cycle
- Beads Notes: Update notes regularly
- E2E Last: Run E2E only after unit tests pass
スコア
総合スコア
40/100
リポジトリの品質指標に基づく評価
✓SKILL.md
SKILL.mdファイルが含まれている
+20
○LICENSE
ライセンスが設定されている
0/10
○説明文
100文字以上の説明がある
0/10
○人気
GitHub Stars 100以上
0/15
○最近の活動
3ヶ月以内に更新がある
0/10
○フォーク
10回以上フォークされている
0/5
✓Issue管理
オープンIssueが50未満
+5
✓言語
プログラミング言語が設定されている
+5
○タグ
1つ以上のタグが設定されている
0/5
レビュー
💬
レビュー機能は近日公開予定です